Installation Vacuum Sealer Setting Manual
페이지 정보

본문
- Connect electricity and compreseed air to the machine.
 - Connect the foot s/w to the machine
 - Fix the work tray to the machine.
 - Check whether compreseed air pressure on the guage of the air regulator is ok ( 6.5㎏/㎠ ).
 - Turn on the NFB of the machine
 - Check whether there is " AIRZERO" on the LCD of the control box.
 
관련링크
- 
                
                
                    http://youtu.be/mVofMaYCjWQ
                
                
416회 연결 




